San Francisco Bay Area

New substation headroom around the Bay is spoken for years out.

Capacity
5 MW
Source
Grid
Stage
Power available

Why this power exists

The position.

New substation headroom around the Bay is spoken for years out.

An energised service is the scarce thing.

Compute placed here sits inside the latency envelope that voice and interactive workloads need.

Power available

Where this stands.

Today

Energised and available, inside the Bay Area latency envelope.

Next

A yard on the pad, and a first offtaker.

Energised service, ready for deployment.

Configuration

What fits here.

Power in a 40 ft unit, compute and coolant distribution in the first 20 ft, heat rejection in the second. The three dock in line on one pad.

Open Yard 400

The rest of the portfolio

Four countries.

Where the power sits North-west coast, Sri Lanka: 100 MW, In development. Undisclosed, Kazakhstan: 100 MW, In development. Ankara region, Türkiye: Under study, Concept. Dallas–Fort Worth, United States: 500 kW, Power available. San Francisco Bay Area, United States: 5 MW, Power available. 100 MW 100 MW Under study 500 kW 5 MW
  • Sri Lanka 100 MW
  • Kazakhstan 100 MW
  • Türkiye Under study
  • United States 500 kW
  • United States 5 MW