Book a call

Engineering package

Documents, and what is still being drawn.

None of the package is released yet. Each card says what the document is and what it waits on.

Engineering package documents

  • Yard 400 general arrangement

    public
    Document
    NW-Y400-GA-001
    Format
    PDF

    Being redrawn from the assembly model.

  • Yard 400 electrical one-line

    gated
    Document
    NW-Y400-EL-001
    Format
    PDF

    Pending review by the electrical engineer of record.

  • Coolant flow and piping diagram

    gated
    Document
    NW-Y400-ME-001
    Format
    PDF

    Pending review by the mechanical engineer of record.

  • Site readiness checklist

    public
    Document
    NW-GEN-SR-001
    Format
    PDF

    In drafting.

  • Module 20 general arrangement

    public
    Document
    NW-M20-GA-001
    Format
    PDF

    Held until the shell section is settled.

  • Compliance and certification matrix

    gated
    Document
    NW-GEN-CC-001
    Format
    PDF

    Opens once a jurisdiction is selected with a customer.

Published now

Specifications on this site.

Every model page carries its full specification, each value with a source and a state. That is the material available today.

  • Campus 7.5

    Rev A

    A chilled-water hall drawn to a published reference topology, with the power and cooling plant built as modules and set on a prepared slab.

    Open specification
  • Yard 400

    Rev A

    Power in a 40 ft unit, compute and coolant distribution in the first 20 ft, heat rejection in the second. The three dock in line on one pad.

    Open specification
  • Module 20

    Rev A

    Racks, coolant distribution, in-row cooling, and life safety inside a single 20 ft unit. It connects to power and water the site already runs.

    Open specification

Next

Ask for what is not here.

Gated material opens against a live site and a named jurisdiction.

Book a call